Friday, January 28, 2011

Paneling and outlets

He wired in the outlets today. They'll connect to the inverter at the rear of the uhaul, which will be connected to the battery and solar panel.

Most of the paneling is done.
The plain masonite was put where cabinets will be built later over the foot of the bed up in the loft (on the left. The head of the bed will be to the right). This side of the loft has to be built out about a foot, to make it wide enough for a double mattress. We'll build storage underneath, which explains the masonite you see right in the middle.


No comments:

Post a Comment